Give each estimate a reference
Three bids for one repair can create a confusing work history if every message becomes a separate generic entry. Identify the job, property and each contractor’s estimate. Then record the review work you actually completed. A quote arriving in your inbox is evidence of receipt; it does not establish that you spent time reading or comparing it.
A review record to copy
Use date, property, job reference, estimate versions reviewed, task, personal minutes, decision or open question, and evidence reference. Keep the contractor’s proposed labour hours in the estimate record. Those hours are not your own work duration. When a quote changes, preserve its version date so a later reviewer can understand which price and scope informed your decision.
Example: comparing two roof-repair proposals
An owner spends 28 minutes comparing two estimates and writes down questions about disposal and warranty coverage. Later that day, they spend 11 minutes discussing the missing details with one contractor. Log a 28-minute comparison and an 11-minute call, for 39 minutes of personal work. Link the comparison note and the relevant quote versions. Do not add the scheduled 30-minute calendar block as a third session.
Example: one session covers two properties
During a 24-minute document review, an owner spends 9 minutes on a fence estimate for property A and 15 minutes on a door replacement for property B. Record the split when supported by the actual session notes. The combined duration remains 24 minutes. If the split was reconstructed later, identify that fact and its basis rather than presenting the allocations as separately timed measurements.
Three cases to flag during review
For a revised estimate, record the work spent reviewing the revision instead of repeating the earlier session. For a cancelled call, record only preparation or coordination that actually happened. For a missing duration, look for contemporaneous notes and mark any estimate clearly. An email timestamp or a document modification time does not by itself establish how long the review took.
Export the facts separately from the classification
Before closing the job, filter its entries and check dates, versions and overlapping intervals. Retain the questions that remain unresolved. These records describe activities and time; they do not automatically establish real estate professional status or the tax treatment of each task. Keep any classification decision distinct and have a qualified adviser review individual circumstances where appropriate.
Related tool: REPS Hours Tracker. This guide accompanies the linked product.